Zahid Business Park, Jeddah

Project data

Location: Jeddah, International

Location: Jeddah, Saudi Arabia

  • Water retention structure in floral design
  • Height: 45 m
  • Structure: circular wall with a diameter of 4.30 m and a ring beam supporting the cantilevered and slightly inclined slab measuring 1.00 m in depth

Requirements

To build the structure, PERI proposed a comprehensive solution with formwork and scaffolding from a single source.

  • individual design
  • tight construction schedule
  • high claims to efficiency and safety

Customer

O.C.C. WEAVERS, Jeddah, Saudi Arabia

Customer's benefit

  • PERI experts supported the construction site team from start to finish
  • formwork and scaffolding from a single source
  • reduced costs
  • increased efficiency
  • high safety precautions on-site
Zahid Business Park 6
Dahen Hassan
Project Manager

For PERI, it was a welcome challenge to size, plan and deliver the platform as well as the enormous scaffold in the time frame available, while constantly liasing with other parties involved. Overall, the project was a huge succes for PERI, the contractor and the client.

PERI solution

PERI proposed a comprehensive solution with formwork and scaffolding from a single source. Optimally coordinated PERI products consisting of only a few components played a major role in ensuring that the project was carried out efficiently. For example, the circular wall structure was constructed using VARIO VT 20 Wall Formwork. This could be optimally adapted to the design and was used for both the interior and exterior walls. For the formwork of the outer wall, the VARIO VT 20 Wall Formwork was supplemented with CB 240 Platforms, which made the climbing process safe.

The BR Shaft Platform provided reliable support for the formwork elements inside the shaft. Here, SB Brace Frames mounted horizontally as a modular frame system ensured that loads were transferred safely. The structure was supported by PERI UP modular scaffolding, while PERI UP Stair Towers were used to assemble the facade efficiently.