Canary Wharf's first high-rise residential building

Buildings

Form structures that stand tall

From universities to residential high-rises, we help shape buildings that bring a city to life. With a range of climbing and formwork options to suit your requirements, our temporary works systems make it possible to construct in challenging environments.

Building Projects

The RCS climbing protection panel complete encloses the upper floors under construction and provides protection against wind and weather - and increases productivity.
One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
The perfectly adapted shoring and working scaffold optimally supplemented the cost-effective formwork solution.
For the very wide range of requirements, PERI provided the most cost-effective solution with the ACS self-climbing formwork.
Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
For the construction of the Hotel Meliá in the La Défense office district, PERI developed a comprehensive climbing formwork solution. This serves not only as an enclosure, which ensures the safety of the construction teams at all times, but also it supports the precast parapets during erection.
Massive, 28 cm thick reinforced concrete balconies cantilever outwards for 3.35 m in an irregular fashion on all four sides of the building.
The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
Each of the two towers has three reinforced concrete cores which were constructed with help of two PERI ACS self-climbing variants.
The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
The PERI CPP climbing protection panel reliably encloses the upper floors under construction.
The cylindrical core and facade walls of this 142 m high office building were constructed with PERI ACS self-climbing technology.
With a height of 415 m, the Trump International Hotel and Tower on the Chicago River is a very impressive skyscraper.
With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.
Habtoor Residences project using PERI ACS Automatic Climbing System