Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.

Integrated Solutions To Support Infrastructure Projects

Overcome any challenges with PERI products for infrastructure, designed to build structures that last.

Infrastructure

PERI Infrastructure Products

PERI UP Flex Shoring: The maximum level of flexibility.
The lightweight stair tower for flexible access solutions
The suspended scaffold can be manoeuvred with little effort due to smooth plastic rollers.
For wide-span working platforms and temporary pedestrian footbridges
With PERI SCS, the loads from the fresh concrete pressure are transferred without formwork ties through the brackets into the climbing anchors of the previous concreting section.

Interested in learning more about our products?

Call us on +966 (0) 11 230 0655 to discuss your requirements further.