The Project
Impressions from the project process
Project Information
Sławomir Ramski | Piotr Kolasa
Construction Manager KPRM | Construction Manager WARBUD
PERI has supplied a perfect solution for bypassing the road with its ongoing traffic. You can completely rely on PERI, 100% – and if necessary, the PERI specialists even come to the jobsite at night or on Sundays and bank holidays.
Are you working on a project like this?
Call us on +966 (0) 11 230 0655 to discuss your requirements further.
Location
Traffic junction Siekierkowska roadway, Poland
![Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.](https://cdn.peri.cloud/.imaging/mWide/dam/d7ff0703-4378-4996-8245-0f15e9c5009a/23334/traffic-junction-czerniakowska-pre-stressed-hollow-box-superstructure-was-formed-with-vario-gt-24-wall-formwork-and-multiflex-slab-formwork.jpg)
![Traffic junction Czerniakowska - pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.](https://cdn.peri.cloud/.imaging/mWide/dam/d7ff0703-4378-4996-8245-0f15e9c5009a/23334/traffic-junction-czerniakowska-pre-stressed-hollow-box-superstructure-was-formed-with-vario-gt-24-wall-formwork-and-multiflex-slab-formwork.jpg)