Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.

Smithland Hydroelectric Power Plant
Smithland, United States

Construction of a hydroelectric power plant with 3 horizontal bulb turbines and a total capacity of 72 MW

Reinforced concrete construction: 78 m long, 62 m wide, 32 m high

Massive component dimensions (slab thickness > 4.00 m)

 

 

Location
Main Application
Water Infrastructure
Project participants
Customer: CJ Mahan Construction Company, Grove City, OH

The Project

Impressions from the project process

Project Information

Related Products

Are you working on a project like this?

Call us on +966 (0) 11 230 0655 to discuss your requirements further.
Location

Smithland Hydroelectric Power Plant, Smithland, USA

Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.