Building in the city centre of Warsaw with striking concrete and glass façade
Height: 70 m
Storeys: 19
Shell construction period: 11 months
Construction period until opening: 2007 – 2011
Location
Main Application
High-Rise Buildings and Towers
Project participants
Customer: Warbud S.A., Warsaw
The Project
Impressions from the project process
The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
A filigree reinforced concrete net covering the glass facade of the Prosta Tower in Warsaw.
PERI engineers combined TRIO panel formwork with specially-designed box outs based on PERI system components.
The PERI UP Rosett modular scaffold could be optimally adapted to suit the complex reinforced concrete structure.
The 70 m high Prosta Tower has 19 floors and 5 basement levels.
The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
A filigree reinforced concrete net covering the glass facade of the Prosta Tower in Warsaw.
PERI engineers combined TRIO panel formwork with specially-designed box outs based on PERI system components.
The PERI UP Rosett modular scaffold could be optimally adapted to suit the complex reinforced concrete structure.
The 70 m high Prosta Tower has 19 floors and 5 basement levels.
Project Information
Rafał Rusek
Project leader
This project was a great challenge for us because fair-faced concrete jobsites often mean a lot of risks. However, with PERI we have found a proficient and experienced partner. This enabled us to safely and successfully implement the project due to PERI’s perfect logistics and prefabricated formwork.
Are you working on a project like this?
Call us on +966 (0) 11 230 0655 to discuss your requirements further.
Location
Prosta Tower, Poland